Skip to metadata.
Document
Download Options
Name Type Format Size
Meridian Road corridor study : Germann Road to McDowell Boulevard : final report Original File
37.49 MB
42845-Extracted Text.txt Extracted Text
Unknown size

Details

Title
  • Meridian Road Corridor Study: Germann Road to McDowell Boulevard - Final Report
Description

The proposed Meridian Road Corridor Study is needed to support the continuing development and growth, occurring and anticipated, in the East Mesa, West Apache Junction, and within Pinal County. The purpose of the Meridian Road Corridor Study is to document

The proposed Meridian Road Corridor Study is needed to support the continuing development and growth, occurring and anticipated, in the East Mesa, West Apache Junction, and within Pinal County. The purpose of the Meridian Road Corridor Study is to document conditions along the existing roadway and to develop alternatives that will increase the safety and future level of service of Meridian Road. This study will also establish a roadway footprint and develop the ultimate right‐of‐way requirement for the corridor. Finally, the study will be utilized as a guide for local agencies and future development along the corridor. The study area for the Meridian Road Corridor Study is approximately 13 miles in length.

Date Created
2013-10
Resource Type
  • Text
  • Identifier
    • Identifier Value
      TRT 5.2:M 36

    Machine-readable links

    Share this content