Description
The purpose of the Hidden Waters Parkway study is to document conditions along the parkway corridor, identify potential fatal flaws and develop an alignment alternative that meets the future traffic needs identified in the Hassayampa Framework Study. The recommended alternative will establish a roadway footprint that may be used as a guide for local agencies and development within the corridor.
Included in this item (8)

Hidden Waters Parkway North: Work Plan (April 2011)
Permanent Link

Hidden Waters Parkway North: Final Report
Permanent Link

TM 1. Existing and Future Corridor Features
Permanent Link
Details
Title
- Hidden Waters Parkway North Feasibility Study: Interstate 10 to State Route 74
Contributors
Agent
Date Created
The date the item was original created (prior to any relationship with the ASU Digital Repositories.)
2012-01
Collections this item is in