Description

The purpose of the Hidden Waters Parkway study is to document conditions along the parkway corridor, identify potential fatal flaws and develop an alignment alternative that meets the future traffic needs identified in the Hassayampa Framework Study. The recommended alternative

The purpose of the Hidden Waters Parkway study is to document conditions along the parkway corridor, identify potential fatal flaws and develop an alignment alternative that meets the future traffic needs identified in the Hassayampa Framework Study. The recommended alternative will establish a roadway footprint that may be used as a guide for local agencies and development within the corridor.

Details

Title
  • Hidden Waters Parkway North Feasibility Study: Interstate 10 to State Route 74
Date Created
2012-01
Identifier
  • Identifier Value
    XCMA 25.2:H 42/2
Note
  • Appendices includes six Technical Memorandums.
  • Earlier Work Plan (April 2011) also available.

Machine-readable links