Skip to metadata.
Document
Download Options
Name Type Format Size
Cave Creek Landfill monitor well completion report Original File
3.17 MB
42483-Extracted Text.txt Extracted Text
Unknown size

Details

Title
  • Cave Creek Landfill Monitor Well Completion Report
Description

This monitor well completion report was prepared to document the construction and installation of monitor well MW-3, located on the southeast side of Black Mountain Parkway. It was installed to provide long-term ground-water monitoring.

Date Created
2008-01
Resource Type
  • Text
  • Identifier
    • Identifier Value
      XCMA 34.2:C 18 M 55

    Machine-readable links

    Share this content