Description

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at the intersection.

Downloads
pdf (9.9 MB)

Details

Title
  • Holladay Street and Forest Avenue Watershed Study: Drainage Relief Assessment for the Drexel/Westover Intersection
Date Created
1989 to 1991
Resource Type
  • Text
  • Identifier
    • Identifier Value
      XCPM 17.3:S 63/13
    Note
    • Special study (Pima County Regional Flood Control District (Ariz.)), opens in a new window ; 13
    • October 4, 1989; revised December 6, 1989.
    • With: Drainage relief assessment for the Drexel/Westover intersection / CMG Drainage Engineering, Inc. (18 p. : Nov. 25-1991)

    Machine-readable links