Skip to metadata.
Document
Download Options
Name Type Format Size
Tortolita area basin management plan. Phase IIB Original File
6.33 MB
42339-Extracted Text.txt Extracted Text
Unknown size

Details

Title
  • Tortolita Area Basin Management Plan: Phase IIB
Description

This plan has focused on two program areas: 1) floodplain management through revised floodplain delineations and assessment of subsequent FEMA mapping revisions; and 2) basin-wide planning issues involving both short- and long-term drainage infrastructure and regulatory needs.

Date Created
1993-08-03
Resource Type
  • Text
  • Identifier
    • Identifier Value
      XCPM 17.3:S 63/24
    Note
    • Special study (Pima County Regional Flood Control District (Ariz.)) ; 24

    Machine-readable links

    Share this content