The State and Local Arizona Documents (SALAD) collection contains documents published by the State of Arizona, its Counties, incorporated Cities or Towns, or affiliated Councils of Government; documents produced under the auspices of a state or local agency, board, commission or department, including reports made to these units; and Salt River Project, a licensed municipality. ASU is a primary collector of state publications and makes a concerted effort to acquire and catalog most materials published by state and local governmental agencies.

The ASU Digital Repository provides access to digital SALAD publications, however the ASU Libraries’ non-digitized Arizona documents can be searched through the ASU Libraries Catalog. For additional assistance, Ask A Government Documents Librarian.

Publications issued by the Morrison Institute for Public Programs at Arizona State University are also available in PRISM, in the Morrison Institute for Public Policy - Publications Archive collection.

Displaying 1 - 10 of 32
Filtering by

Clear all filters

42400-Thumbnail Image.png
ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2007-12-06
Description

This study is intended to assess flood risk, and identify flood hazards based on those risks, for the Beaver Dam area from the Beaver Dam Wash. The hydrologic and hydraulic results are intended for risk assessment and emergency management purposes only. The results of this study should not be considered

This study is intended to assess flood risk, and identify flood hazards based on those risks, for the Beaver Dam area from the Beaver Dam Wash. The hydrologic and hydraulic results are intended for risk assessment and emergency management purposes only. The results of this study should not be considered as “best available technical information” for floodplain management purposes.”

Created2014 to 2017
Description

The Short Range Transit Program identifies those regional transit service and capital improvements programmed in the Transit Life Cycle Program during the next five years and provides support for regional transit projects contained in the Maricopa Association of Governments Regional Transportation Plan.

Created2005 to 2016
Description

Valley Metro's management is responsible for establishing and maintaining an internal control structure designed to ensure that the assets of METRO are protected from loss, theft, or misuse and to ensure that adequate accounting data are compiled to allow for the preparation of financial statements.

Created2006 to 2008
Description

The Project is responsible for the design and construction of a 19.6 mile, double track system. These reports offer a month-by-month progress report.

41752-Thumbnail Image.png
ContributorsHoffman, Dennis (Author) / Rex, Tom (Author) / Center for Competitiveness and Prosperity Research (Contributor)
Created2008-12
Description

In a paper released by the Goldwater Institute on December 18, 2008, "A Fresh Start for Arizona: Proposals for Closing a Billion-Dollar Budget Gap," Byron Schlomach puts forth recommendations for closing the deficit in the state government general fund. The following notes are an attempt to illustrate the consequences of

In a paper released by the Goldwater Institute on December 18, 2008, "A Fresh Start for Arizona: Proposals for Closing a Billion-Dollar Budget Gap," Byron Schlomach puts forth recommendations for closing the deficit in the state government general fund. The following notes are an attempt to illustrate the consequences of the spending reductions recommended by Dr. Schlomach, along with some considerations about the philosophy apparently embodied in the recommendations.

41809-Thumbnail Image.png
ContributorsHoffman, Dennis (Author) / Rex, Tom (Author) / Center for Competitiveness and Prosperity Research (Contributor)
Created2008-06
Description

The initial $1.4 billion construction investment results in an immediate addition of $828 million to GSP and $700 million in labor income after controlling for resource and material acquisition from out-of-state sources. The in-state activity induces additional GSP generation of $1.1 billion and $711 million in labor income as the

The initial $1.4 billion construction investment results in an immediate addition of $828 million to GSP and $700 million in labor income after controlling for resource and material acquisition from out-of-state sources. The in-state activity induces additional GSP generation of $1.1 billion and $711 million in labor income as the direct effects ripple through the Arizona economy.

41812-Thumbnail Image.png
Created2008-01
Description

This brief report provides conceptual perspectives on public investment using debt financing. Empirical evidence of the relationship between public investment and economic activity is provided, showing that moderate levels of debt do not impair economic growth and may provide a stimulus to growth. Arizona's public debt currently is low relative

This brief report provides conceptual perspectives on public investment using debt financing. Empirical evidence of the relationship between public investment and economic activity is provided, showing that moderate levels of debt do not impair economic growth and may provide a stimulus to growth. Arizona's public debt currently is low relative to national standards. Related to this low debt, public investment in infrastructure has fallen behind the state's population and economic growth over the last 15 years. Because of low interest rates and a construction slump that will reduce construction costs, current conditions are ideal for public investment using debt financing.