The State and Local Arizona Documents (SALAD) collection contains documents published by the State of Arizona, its Counties, incorporated Cities or Towns, or affiliated Councils of Government; documents produced under the auspices of a state or local agency, board, commission or department, including reports made to these units; and Salt River Project, a licensed municipality. ASU is a primary collector of state publications and makes a concerted effort to acquire and catalog most materials published by state and local governmental agencies.

The ASU Digital Repository provides access to digital SALAD publications, however the ASU Libraries’ non-digitized Arizona documents can be searched through the ASU Libraries Catalog. For additional assistance, Ask A Government Documents Librarian.

Publications issued by the Morrison Institute for Public Programs at Arizona State University are also available in PRISM, in the Morrison Institute for Public Policy - Publications Archive collection.

Displaying 1 - 10 of 18
Filtering by

Clear all filters

Created2011 to 2016
Description

The State of the System Report is a compilation of the physical inventory and status of the Maricopa County Department of Transportation’s infrastructure. It addresses roadway congestion, traffic safety, low volume road paving, bridges, and pavement conditions. Also, included are recommendations for future improvements within each of the infrastructure categories.

The State of the System Report is a compilation of the physical inventory and status of the Maricopa County Department of Transportation’s infrastructure. It addresses roadway congestion, traffic safety, low volume road paving, bridges, and pavement conditions. Also, included are recommendations for future improvements within each of the infrastructure categories. The SOS report has been produced annually since 1998.

117491-Thumbnail Image.png
Created2013-07
Description

The Arizona Department of Transportation, through its Multimodal Planning and Communications divisions, collaborated with the town of Queen Creek to conduct a transportation study of the Germann Road corridor. The study, which is funded through the Planning Assistance for Rural Areas (PARA) program, was completed in July 2013.

118020-Thumbnail Image.png
Created1991-07
Description

This project was undertaken to compare operational and safety characteristics of leading versus lagging protected left turn operation. The measures of effectiveness included field measured intersection delay with leading and with lagging left turns. Intersections in Pima County, Glendale, Tempe and Mesa, Arizona were studied with both leading and lagging

This project was undertaken to compare operational and safety characteristics of leading versus lagging protected left turn operation. The measures of effectiveness included field measured intersection delay with leading and with lagging left turns. Intersections in Pima County, Glendale, Tempe and Mesa, Arizona were studied with both leading and lagging operation. Intersection delay studies were also done with first car versus third car actuation of leading protected left turn phases. Signal progression was studied with leading, lagging and combination of leading and lagging left turns which provided the best progression. This evaluation was accomplished with an instrumented vehicle and travel time runs throughout a grid. Accident studies were conducted in Tucson, Pima County and Scottsdale, Arizona. These studies compared accident frequency before and after the conversion from leading to lagging left turns. A public opinion survey was conducted to obtain motorists' preference of leading or lagging left turns.

Created1999-05-19
Description

This plan updates, expands and continues the work of the "1994 Maricopa County Draft Bicycle Plan." Utilizing a five year time frame the Bicycle System Plan works towards implementing bicycle related recommendations from the "Comprehensive Plan" and "Transportation System Plan" as adopted by the Board of Supervisors.

Created2009 to 2017
Description

Constitutes the Department's annual report and projected plans for the coming year. The report covers a five year period, but is issued annually.

Created2007-02-07
Description

This is Maricopa County's long-range plan for transportation. This plan was last produced in 1997. The Maricopa County Department of Transportation has undertaken the process of updating the Transportation System Plan because much has happened in Maricopa County since 1997. This updated TSP establishes an organized approach to the planning,

This is Maricopa County's long-range plan for transportation. This plan was last produced in 1997. The Maricopa County Department of Transportation has undertaken the process of updating the Transportation System Plan because much has happened in Maricopa County since 1997. This updated TSP establishes an organized approach to the planning, design and construction of Maricopa County's transportation system through 2026.

Created2012 to 2016
Description

The Strategic Plan comprises an ambitious set of goals and objectives. It is a “living” document that will guide our focus and activities. As such, some objectives and expected results will be subject to change as information and events unfold. Objectives and measures aligned to drive achievement have also been

The Strategic Plan comprises an ambitious set of goals and objectives. It is a “living” document that will guide our focus and activities. As such, some objectives and expected results will be subject to change as information and events unfold. Objectives and measures aligned to drive achievement have also been developed in Units, Sections, and Divisions throughout the Department.