The State and Local Arizona Documents (SALAD) collection contains documents published by the State of Arizona, its Counties, incorporated Cities or Towns, or affiliated Councils of Government; documents produced under the auspices of a state or local agency, board, commission or department, including reports made to these units; and Salt River Project, a licensed municipality. ASU is a primary collector of state publications and makes a concerted effort to acquire and catalog most materials published by state and local governmental agencies.

The ASU Digital Repository provides access to digital SALAD publications, however the ASU Libraries’ non-digitized Arizona documents can be searched through the ASU Libraries Catalog. For additional assistance, Ask A Government Documents Librarian.

Publications issued by the Morrison Institute for Public Programs at Arizona State University are also available in PRISM, in the Morrison Institute for Public Policy - Publications Archive collection.

Displaying 1 - 10 of 16
Filtering by

Clear all filters

42485-Thumbnail Image.png
ContributorsElliott D. Pollack & Company (Publisher)
Created1998
Description

Chiefly statistics from monitoring of wells in the areas adjacent to the Cave Creek Landfill.

118020-Thumbnail Image.png
Created1991-07
Description

This project was undertaken to compare operational and safety characteristics of leading versus lagging protected left turn operation. The measures of effectiveness included field measured intersection delay with leading and with lagging left turns. Intersections in Pima County, Glendale, Tempe and Mesa, Arizona were studied with both leading and lagging

This project was undertaken to compare operational and safety characteristics of leading versus lagging protected left turn operation. The measures of effectiveness included field measured intersection delay with leading and with lagging left turns. Intersections in Pima County, Glendale, Tempe and Mesa, Arizona were studied with both leading and lagging operation. Intersection delay studies were also done with first car versus third car actuation of leading protected left turn phases. Signal progression was studied with leading, lagging and combination of leading and lagging left turns which provided the best progression. This evaluation was accomplished with an instrumented vehicle and travel time runs throughout a grid. Accident studies were conducted in Tucson, Pima County and Scottsdale, Arizona. These studies compared accident frequency before and after the conversion from leading to lagging left turns. A public opinion survey was conducted to obtain motorists' preference of leading or lagging left turns.

42272-Thumbnail Image.png
ContributorsElliott D. Pollack & Company (Contributor)
Created2008-10
Description

The primary need for these realignments is due to the planned airport expansion at Tucson International Airport. The purpose of this report is to compare various alignment alternatives for the realignment on the basis of access, cost, right-of-way, and floodplain impacts.

42075-Thumbnail Image.png
ContributorsElliott D. Pollack & Company (Contributor)
Created2013-01
Description

There are two distinct components to the economic development activities described in ADOH’s LIHTC program details. The first component is activity that strengthens the economy. This is the quantifiable activity that is the subject of this report. The second component is community building activity which can be both quantitative and

There are two distinct components to the economic development activities described in ADOH’s LIHTC program details. The first component is activity that strengthens the economy. This is the quantifiable activity that is the subject of this report. The second component is community building activity which can be both quantitative and qualitative. This is an area that should be considered in the debate but which is not addressed within this report.

42340-Thumbnail Image.png
ContributorsElliott D. Pollack & Company (Publisher)
Created1993-07-30
Description

The purpose of this study is to (1) develop a fundamental understanding of the problems that exist, and (2) perform a cursory examination of possible management approaches identifying those that appear most plausible for further consideration.

42166-Thumbnail Image.png
ContributorsArizona State Parks Board (Author)
Created2012
Description

The Arizona State Parks Board was created in 1957 as a government agency with the purposes and objectives to include acquiring, preserving and maintaining areas of natural features, scenic beauty, and historic and scientific significance, pleasure recreation, and health of Arizona’s people.

42071-Thumbnail Image.png
ContributorsArizona State Parks Board (Author)
Created2015
Description

The purpose of the Arizona Trails 2015 Plan is to gather information and recommendations to guide Arizona State Parks and other land management agencies in the management of motorized and non­‐motorized trails, and guide the distribution and expenditures of the Off‐Highway Vehicle Recreation Fund and the Federal Recreational Trails Program.

The purpose of the Arizona Trails 2015 Plan is to gather information and recommendations to guide Arizona State Parks and other land management agencies in the management of motorized and non­‐motorized trails, and guide the distribution and expenditures of the Off‐Highway Vehicle Recreation Fund and the Federal Recreational Trails Program. The Arizona Trails Plan is updated every five years.