The State and Local Arizona Documents (SALAD) collection contains documents published by the State of Arizona, its Counties, incorporated Cities or Towns, or affiliated Councils of Government; documents produced under the auspices of a state or local agency, board, commission or department, including reports made to these units; and Salt River Project, a licensed municipality. ASU is a primary collector of state publications and makes a concerted effort to acquire and catalog most materials published by state and local governmental agencies.

The ASU Digital Repository provides access to digital SALAD publications, however the ASU Libraries’ non-digitized Arizona documents can be searched through the ASU Libraries Catalog. For additional assistance, Ask A Government Documents Librarian.

Publications issued by the Morrison Institute for Public Programs at Arizona State University are also available in PRISM, in the Morrison Institute for Public Policy - Publications Archive collection.

Displaying 1 - 10 of 16
Filtering by

Clear all filters

42400-Thumbnail Image.png
ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2007-12-06
Description

This study is intended to assess flood risk, and identify flood hazards based on those risks, for the Beaver Dam area from the Beaver Dam Wash. The hydrologic and hydraulic results are intended for risk assessment and emergency management purposes only. The results of this study should not be considered

This study is intended to assess flood risk, and identify flood hazards based on those risks, for the Beaver Dam area from the Beaver Dam Wash. The hydrologic and hydraulic results are intended for risk assessment and emergency management purposes only. The results of this study should not be considered as “best available technical information” for floodplain management purposes.”

Created2014 to 2017
Description

The Short Range Transit Program identifies those regional transit service and capital improvements programmed in the Transit Life Cycle Program during the next five years and provides support for regional transit projects contained in the Maricopa Association of Governments Regional Transportation Plan.

Created2005 to 2016
Description

Valley Metro's management is responsible for establishing and maintaining an internal control structure designed to ensure that the assets of METRO are protected from loss, theft, or misuse and to ensure that adequate accounting data are compiled to allow for the preparation of financial statements.

Created2006 to 2008
Description

The Project is responsible for the design and construction of a 19.6 mile, double track system. These reports offer a month-by-month progress report.

ContributorsValley Metro Rail (Author)
Created2009 to 2016
Description

METRO's management is responsible for establishing and maintaining an internal control structure designed to ensure that the assets of METRO are protected from loss, theft, or misuse and to ensure that adequate accounting data are compiled to allow for the preparation of financial statements.

ContributorsValley Metro Rail (Author)
Created2009 to 2016
Description

The Operating and Capital Budget is prepared with the goal of delivering a fiscally prudent, balanced budget. A Five-Year Capital and Operating Program identifies anticipated capital projects, their anticipated capital and operating costs, and funding sources.

42453-Thumbnail Image.png
ContributorsValley Metro Rail (Author)
Created2006-07
Description

METRO will be recognized as a trusted and respected community partner and visionary leader that provides a premier regional rail transit system with a commitment to excellence and safety, which provides value, enhances quality of life and is a point of pride for our community.

42454-Thumbnail Image.png
ContributorsValley Metro Rail (Contributor)
Created2010-04
Description

The development of a Life Cycle program began for each of the three major transportation elements identified within the Regional Transportation Plan. The RPTA is responsible for preparation of the transit component of the Life Cycle program, and METRO has been further delegated the responsibility to prepare the high capacity

The development of a Life Cycle program began for each of the three major transportation elements identified within the Regional Transportation Plan. The RPTA is responsible for preparation of the transit component of the Life Cycle program, and METRO has been further delegated the responsibility to prepare the high capacity transit/light rail transit element.

ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2014-09-03
Description

The result of an application to the Arizona Department of Transportation Planning Assistance for Rural Areas (PARA) Program to conduct a multimodal transportation study to address transportation issues in the community. The purpose of the study is to identify the most critical multimodal transportation infrastructure and service needs within the

The result of an application to the Arizona Department of Transportation Planning Assistance for Rural Areas (PARA) Program to conduct a multimodal transportation study to address transportation issues in the community. The purpose of the study is to identify the most critical multimodal transportation infrastructure and service needs within the Picture Rocks study area and recommend a program of short-range (0-5 years), mid-range (6-10 years), and long-range (11-20 years) improvements.

42332-Thumbnail Image.png
ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2014-06
Description

Transportation excise tax money is statutorily restricted to street and highway purposes or transportation projects. Gila County demonstrated that it spent excise tax monies during calendar years 2009 through 2013 to address traffic safety and congestion issues and deteriorating road conditions. Also, in January 2014, the County completed the Gila

Transportation excise tax money is statutorily restricted to street and highway purposes or transportation projects. Gila County demonstrated that it spent excise tax monies during calendar years 2009 through 2013 to address traffic safety and congestion issues and deteriorating road conditions. Also, in January 2014, the County completed the Gila County Transportation Study, which identified the most critical future transportation infrastructure needs and recommended projects to address those needs. We also determined that the County spent its excise tax monies solely for street and highway purposes or transportation projects as required by Arizona Revised Statutes §28-6392(B), and implemented all but one of our prior audit recommendations.