The State and Local Arizona Documents (SALAD) collection contains documents published by the State of Arizona, its Counties, incorporated Cities or Towns, or affiliated Councils of Government; documents produced under the auspices of a state or local agency, board, commission or department, including reports made to these units; and Salt River Project, a licensed municipality. ASU is a primary collector of state publications and makes a concerted effort to acquire and catalog most materials published by state and local governmental agencies.

The ASU Digital Repository provides access to digital SALAD publications, however the ASU Libraries’ non-digitized Arizona documents can be searched through the ASU Libraries Catalog. For additional assistance, Ask A Government Documents Librarian.

Publications issued by the Morrison Institute for Public Programs at Arizona State University are also available in PRISM, in the Morrison Institute for Public Policy - Publications Archive collection.

Displaying 1 - 10 of 63
Filtering by

Clear all filters

Created2009-08-24
Description

The purpose of the Drainage Design Manual for Mohave County is to supplement the Mohave County Land Division Regulations by providing minimum requirements and guidelines for addressing storm water issues associated with new and existing development. A secondary purpose is to provide guidance and detail for implementation of the District's

The purpose of the Drainage Design Manual for Mohave County is to supplement the Mohave County Land Division Regulations by providing minimum requirements and guidelines for addressing storm water issues associated with new and existing development. A secondary purpose is to provide guidance and detail for implementation of the District's Floodplain Ordinance.

Created2006 to 2008
Description

The Project is responsible for the design and construction of a 19.6 mile, double track system. These reports offer a month-by-month progress report.

ContributorsValley Metro Rail (Author)
Created2009 to 2016
Description

METRO's management is responsible for establishing and maintaining an internal control structure designed to ensure that the assets of METRO are protected from loss, theft, or misuse and to ensure that adequate accounting data are compiled to allow for the preparation of financial statements.

42452-Thumbnail Image.png
Created2008
Description

Recognizing that public art is an integral element to the success of the system, METRO was proud to incorporate artists in the design process from the very start. The public art that resulted from this process is a celebration of place and community. Each station boasts its own unique character

Recognizing that public art is an integral element to the success of the system, METRO was proud to incorporate artists in the design process from the very start. The public art that resulted from this process is a celebration of place and community. Each station boasts its own unique character with artwork that strives to add substance, style and even a touch of whimsy to the transit experience.

42259-Thumbnail Image.png
Created2013-11-25
Description

The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Concentration Point for the Unnamed 02 and 03 Washes, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data. This is a local study and has not been submitted

The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Concentration Point for the Unnamed 02 and 03 Washes, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data. This is a local study and has not been submitted to FEMA.

42270-Thumbnail Image.png
Created2014-05
Description

Eight years into project delivery, the Regional Transportation Authority has completed more than 560 of the multi-modal projects spelled out in the 20-year RTA plan. One of the plan's signature projects, the Tucson streetcar, is set to start passenger service in summer 2014.

Created2007 to 2017
Description

The 20-year transportation plan includes roadway, transit, safety, and environmental and economic vitality elements to help meet the region's transportation goals of improving our safety and cross-town mobility, while reducing traffic congestion.

42282-Thumbnail Image.png
Created2012-11-29
Description

The objective of this Technical Data Notebook is to provide 100-yr peak discharges at Concentration Points for the Unnamed Wash 12, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data.

42283-Thumbnail Image.png
Created2012-11-29
Description

This Technical Data notebook has been prepared to study a portion of the Pegler Wash located in Pima County, Arizona. The objective of the TDN is provide regulatory discharge rates and floodplain limits along the Pegler Wash using better topographic, hydrologic, and hydraulic data.