The State and Local Arizona Documents (SALAD) collection contains documents published by the State of Arizona, its Counties, incorporated Cities or Towns, or affiliated Councils of Government; documents produced under the auspices of a state or local agency, board, commission or department, including reports made to these units; and Salt River Project, a licensed municipality. ASU is a primary collector of state publications and makes a concerted effort to acquire and catalog most materials published by state and local governmental agencies.

The ASU Digital Repository provides access to digital SALAD publications, however the ASU Libraries’ non-digitized Arizona documents can be searched through the ASU Libraries Catalog. For additional assistance, Ask A Government Documents Librarian.

Publications issued by the Morrison Institute for Public Programs at Arizona State University are also available in PRISM, in the Morrison Institute for Public Policy - Publications Archive collection.

Displaying 1 - 10 of 20
Filtering by

Clear all filters

Created2011-06
Description

The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements

The primary purpose of this study is to determine what transportation improvements would be needed to accommodate future growth and development of the Raytheon Missile Systems facility located south of Tucson International Airport on Hermans Road. A secondary purpose of this study is to consider longer-term roadway and transit improvements that will improve access to Tucson International Airport and associated airport property planned for future development. Specifically, the study analyzed the effects of closing Hughes Access Road/Alvernon Way to non-Raytheon traffic and recommends alternative roadway improvements that would be needed to accommodate this closure.

Created2014-03-14
Description

The Arizona Department of Transportation, in coordination with Apache County District II and the Fort Defiance Chapter of the Navajo Nation, analyzed the traffic circulation conditions of Navajo Routes 7, 12, 54, 110, and 112 within the Fort Defiance Industrial Area which is designated as a major growth area on

The Arizona Department of Transportation, in coordination with Apache County District II and the Fort Defiance Chapter of the Navajo Nation, analyzed the traffic circulation conditions of Navajo Routes 7, 12, 54, 110, and 112 within the Fort Defiance Industrial Area which is designated as a major growth area on the Navajo Nation. The study was funded by the Federal Highway Administration’s State Planning and Research Program and administered through ADOT’s Multimodal Planning Division's Planning Assistance for Rural Areas (PARA) program. The study was initiated to develop a planning strategy to improve the mobility and safety within the Fort Defiance Industrial Area.

Created2011 to 2017
Description

A report of the Board's activities related to the Statewide Transportation Acceleration Needs Account

Created2005 to 2007
Description

In September 2004, ADOT awarded a contract for the Pinal County Corridors Definition Study to Kimley-Horn and Associates. The scope of the Pinal County Corridors Definition Study included the following activities:
* Confirm the need for the East Valley and the North-South corridors;
* Define planning-level corridor definition alternatives;
* Perform a technical

In September 2004, ADOT awarded a contract for the Pinal County Corridors Definition Study to Kimley-Horn and Associates. The scope of the Pinal County Corridors Definition Study included the following activities:
* Confirm the need for the East Valley and the North-South corridors;
* Define planning-level corridor definition alternatives;
* Perform a technical assessment of engineering, environmental, and land use compatibility constraints opportunities for the planning-level corridor definition alternatives;
* Identify to the extent possible, feasible and preferred planning-level corridor definitions on the basis of the technical evaluation;
* Document planning-level costs of corridor development (including studies, design, construction, and right-of-way costs) for the preferred corridor definitions.

The Pinal County Corridors Definition Study resulted in sufficient detail to provide a basis for the future establishment of geometric roadway alignments and corridor design concepts, the preservation of right-of-way, and the identification of required environmental clearance studies.

Created2001 to 2006
Description

This document is intended to give an overview of the Federal-Aid Program and its impacts on Arizona. There are four major sections in the report: (1) Overview of the Federal-Aid Program; (2) Arizona Federal funding highlights for the fiscal year; (3) Federal-aid Highway Program Characteristics; and (4) Federal-Aid Highway Program

This document is intended to give an overview of the Federal-Aid Program and its impacts on Arizona. There are four major sections in the report: (1) Overview of the Federal-Aid Program; (2) Arizona Federal funding highlights for the fiscal year; (3) Federal-aid Highway Program Characteristics; and (4) Federal-Aid Highway Program descriptions. The first section gives a general overview of how the Federal-Aid Program is financed, the authorization process and a discussion of the apportionment, allocation and obligation authority processes. The second section deals with Arizona Federal funding highlights the for fiscal year. The last two sections are devoted to characteristics of the core programs, including eligibility, limitations, apportionment formulas and descriptions of the funding categories.

Created2000 to 2016
Description

The Arizona Department of Transportation was authorized in 1996 to administer a State Infrastructure Bank under a cooperative agreement with the Federal Highway Administration. The Highway Expansion and Extension Loan Program (HELP) was established. The financial statements present only the funds comprising the Fund and are not intended to present

The Arizona Department of Transportation was authorized in 1996 to administer a State Infrastructure Bank under a cooperative agreement with the Federal Highway Administration. The Highway Expansion and Extension Loan Program (HELP) was established. The financial statements present only the funds comprising the Fund and are not intended to present fairly the financial position or results of operations of the Department.

Created1998 to 2017
Description

The HELP program is meant to be a funding tool to accelerate needed highway projects throughout the state. Board Funding Obligations are an important part of the HELP capitalization and the current stress on the State's General Fund has impacted our ability to use BFOs as a funding source for

The HELP program is meant to be a funding tool to accelerate needed highway projects throughout the state. Board Funding Obligations are an important part of the HELP capitalization and the current stress on the State's General Fund has impacted our ability to use BFOs as a funding source for new loans. Though $140 million of BFOs are authorized by statute to capitalize the HELP, the State Treasurer was required to call all outstanding BFOs in April 2009. Consequently, the State Transportation Board and the Department have suspended the HELP program given the uncertainty of a long term funding source.