The State and Local Arizona Documents (SALAD) collection contains documents published by the State of Arizona, its Counties, incorporated Cities or Towns, or affiliated Councils of Government; documents produced under the auspices of a state or local agency, board, commission or department, including reports made to these units; and Salt River Project, a licensed municipality. ASU is a primary collector of state publications and makes a concerted effort to acquire and catalog most materials published by state and local governmental agencies.

The ASU Digital Repository provides access to digital SALAD publications, however the ASU Libraries’ non-digitized Arizona documents can be searched through the ASU Libraries Catalog. For additional assistance, Ask A Government Documents Librarian.

Publications issued by the Morrison Institute for Public Programs at Arizona State University are also available in PRISM, in the Morrison Institute for Public Policy - Publications Archive collection.

Displaying 1 - 10 of 49
Filtering by

Clear all filters

Created2005-02
Description

In 2001, ADWR undertook a review of the Upper San Pedro Basin to determine if it met the statutory requirements for designation as an AMA. This report reviews the water supply and demand of the USP Basin in the context of the statutory criteria and includes a discussion of whether

In 2001, ADWR undertook a review of the Upper San Pedro Basin to determine if it met the statutory requirements for designation as an AMA. This report reviews the water supply and demand of the USP Basin in the context of the statutory criteria and includes a discussion of whether any of the criteria have been met. Previously, ADWR conducted a study of the USP Basin and issued a report in 1988 in which ADWR determined that the Basin did not meet the statutory criteria for AMA designation. ADWR indicated in the report that it would reassess conditions in the Basin in ten to fifteen years. The study described in this report is an evaluation of whether the conditions of the USP Basin satisfy the statutory criteria. This report contains a description of the current and projected water resources and water demand in the Basin, incorporating new information since the previous review. The report examines historic water use trends, evaluates the groundwater resources of the Basin, and projects impacts of future water use on Basin groundwater supplies. The report includes an evaluation of the incidence of subsidence or fissuring, and of the potential for groundwater quality degradation due to groundwater use. The report further describes and evaluates the impact that AMA practices would have on water use, and includes a summary of findings, the director’s determination of whether the Basin should be designated and recommendations.

Created2010 to 2011
Description

Pima County's Cienega Creek Natural Preserve surface water and groundwater monitoring project. This report summaries PAG's groundwater and surface water monitoring between July and June each fiscal/ monitoring year. The report contains monitoring methodology, comprehensive maps, and graphs of trends for surface flow volume, wet-dry flow lengths, groundwater levels and

Pima County's Cienega Creek Natural Preserve surface water and groundwater monitoring project. This report summaries PAG's groundwater and surface water monitoring between July and June each fiscal/ monitoring year. The report contains monitoring methodology, comprehensive maps, and graphs of trends for surface flow volume, wet-dry flow lengths, groundwater levels and water chemistry. It also contains information on drought, erosion and repeat photography.

42480-Thumbnail Image.png
Created1993-09-17
Description

This document has been prepared to fulfill the requirements for a hydraulic study for the Cave Creek Landfill operated by Maricopa County.

Created2011 to 2017
Description

A report of the Board's activities related to the Statewide Transportation Acceleration Needs Account

Created2004 to 2013
Description

A majority of the work performed by ADEQ's Nonpoint Source Program is funded by Clean Water Act grants, awarded by the U.S. Environmental Protection Agency which requires States to report annually on progress in meeting the schedule of milestones contained in their nonpoint source management plans, and report reductions in

A majority of the work performed by ADEQ's Nonpoint Source Program is funded by Clean Water Act grants, awarded by the U.S. Environmental Protection Agency which requires States to report annually on progress in meeting the schedule of milestones contained in their nonpoint source management plans, and report reductions in nonpoint source pollutant loadings and improvement in water quality resulting from program implementation.

Created2006-10-10
Description

The Hydrology Division of the Arizona Department of Water Resources has been in the process over the last two years of updating the geology used in the Department’s Salt River Valley Regional Groundwater Flow Model. The geology update is the first phase of an overall plan to update the model’s

The Hydrology Division of the Arizona Department of Water Resources has been in the process over the last two years of updating the geology used in the Department’s Salt River Valley Regional Groundwater Flow Model. The geology update is the first phase of an overall plan to update the model’s geologic structure, numerical grid and extend the model’s steady-state and transient calibration periods. Releasing the provisional geologic report at this time allows us to provide the new data and analysis to water providers and other model users prior to the completion of the overall model update. Please be advised that the geologic data and interpretations that are included in this report and accompanying database are provisional at this time and subject to revision.

Created2001 to 2006
Description

This document is intended to give an overview of the Federal-Aid Program and its impacts on Arizona. There are four major sections in the report: (1) Overview of the Federal-Aid Program; (2) Arizona Federal funding highlights for the fiscal year; (3) Federal-aid Highway Program Characteristics; and (4) Federal-Aid Highway Program

This document is intended to give an overview of the Federal-Aid Program and its impacts on Arizona. There are four major sections in the report: (1) Overview of the Federal-Aid Program; (2) Arizona Federal funding highlights for the fiscal year; (3) Federal-aid Highway Program Characteristics; and (4) Federal-Aid Highway Program descriptions. The first section gives a general overview of how the Federal-Aid Program is financed, the authorization process and a discussion of the apportionment, allocation and obligation authority processes. The second section deals with Arizona Federal funding highlights the for fiscal year. The last two sections are devoted to characteristics of the core programs, including eligibility, limitations, apportionment formulas and descriptions of the funding categories.

Created2000 to 2016
Description

The Arizona Department of Transportation was authorized in 1996 to administer a State Infrastructure Bank under a cooperative agreement with the Federal Highway Administration. The Highway Expansion and Extension Loan Program (HELP) was established. The financial statements present only the funds comprising the Fund and are not intended to present

The Arizona Department of Transportation was authorized in 1996 to administer a State Infrastructure Bank under a cooperative agreement with the Federal Highway Administration. The Highway Expansion and Extension Loan Program (HELP) was established. The financial statements present only the funds comprising the Fund and are not intended to present fairly the financial position or results of operations of the Department.

Created1998 to 2017
Description

The HELP program is meant to be a funding tool to accelerate needed highway projects throughout the state. Board Funding Obligations are an important part of the HELP capitalization and the current stress on the State's General Fund has impacted our ability to use BFOs as a funding source for

The HELP program is meant to be a funding tool to accelerate needed highway projects throughout the state. Board Funding Obligations are an important part of the HELP capitalization and the current stress on the State's General Fund has impacted our ability to use BFOs as a funding source for new loans. Though $140 million of BFOs are authorized by statute to capitalize the HELP, the State Treasurer was required to call all outstanding BFOs in April 2009. Consequently, the State Transportation Board and the Department have suspended the HELP program given the uncertainty of a long term funding source.