The State and Local Arizona Documents (SALAD) collection contains documents published by the State of Arizona, its Counties, incorporated Cities or Towns, or affiliated Councils of Government; documents produced under the auspices of a state or local agency, board, commission or department, including reports made to these units; and Salt River Project, a licensed municipality. ASU is a primary collector of state publications and makes a concerted effort to acquire and catalog most materials published by state and local governmental agencies.

The ASU Digital Repository provides access to digital SALAD publications, however the ASU Libraries’ non-digitized Arizona documents can be searched through the ASU Libraries Catalog. For additional assistance, Ask A Government Documents Librarian.

Publications issued by the Morrison Institute for Public Programs at Arizona State University are also available in PRISM, in the Morrison Institute for Public Policy - Publications Archive collection.

Displaying 1 - 10 of 78
Filtering by

Clear all filters

Created2005-02
Description

In 2001, ADWR undertook a review of the Upper San Pedro Basin to determine if it met the statutory requirements for designation as an AMA. This report reviews the water supply and demand of the USP Basin in the context of the statutory criteria and includes a discussion of whether

In 2001, ADWR undertook a review of the Upper San Pedro Basin to determine if it met the statutory requirements for designation as an AMA. This report reviews the water supply and demand of the USP Basin in the context of the statutory criteria and includes a discussion of whether any of the criteria have been met. Previously, ADWR conducted a study of the USP Basin and issued a report in 1988 in which ADWR determined that the Basin did not meet the statutory criteria for AMA designation. ADWR indicated in the report that it would reassess conditions in the Basin in ten to fifteen years. The study described in this report is an evaluation of whether the conditions of the USP Basin satisfy the statutory criteria. This report contains a description of the current and projected water resources and water demand in the Basin, incorporating new information since the previous review. The report examines historic water use trends, evaluates the groundwater resources of the Basin, and projects impacts of future water use on Basin groundwater supplies. The report includes an evaluation of the incidence of subsidence or fissuring, and of the potential for groundwater quality degradation due to groundwater use. The report further describes and evaluates the impact that AMA practices would have on water use, and includes a summary of findings, the director’s determination of whether the Basin should be designated and recommendations.

Created2005-05-02
Description

The La Paz County Comprehensive Plan is the first overall plan for development countywide. Due to the passage of new state requirements and a desire to plan for the future, the La Paz County Board of Supervisors contracted with Partners for Strategic Action, Inc. to develop the county’s first comprehensive

The La Paz County Comprehensive Plan is the first overall plan for development countywide. Due to the passage of new state requirements and a desire to plan for the future, the La Paz County Board of Supervisors contracted with Partners for Strategic Action, Inc. to develop the county’s first comprehensive plan. The consulting team was directed to solicit broad community participation, study the county planning area, and develop a plan that would be an easy-to-understand policy document that will guide La Paz County’s development in the future.

ContributorsChandler (Ariz.) (Publisher)
Created1999-09-16
Description

The Southeast Chandler Area Plan seeks to pay respect to the sense of place and history embedded in Southeast Chandler while simultaneously; a) supporting the diversity of lifestyles and development preferences of existing and future residents; b) nurturing true community building and stewardship over the unique attributes of the area;

The Southeast Chandler Area Plan seeks to pay respect to the sense of place and history embedded in Southeast Chandler while simultaneously; a) supporting the diversity of lifestyles and development preferences of existing and future residents; b) nurturing true community building and stewardship over the unique attributes of the area; and, c) fostering quality development based on sound planning principles and meaningful public involvement.

Created1994-04-29
Description

Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.

Created2013-12-12
Description

An update of Tempe's general plan, containing the city's vision of what Tempe will look like in 2040 and how it will function as a community. The plan is guided by these principles: balanced land use; enhanced quality of life and preservation of neighborhood character; increased economic vitality; sustained mobility/greater

An update of Tempe's general plan, containing the city's vision of what Tempe will look like in 2040 and how it will function as a community. The plan is guided by these principles: balanced land use; enhanced quality of life and preservation of neighborhood character; increased economic vitality; sustained mobility/greater accessibility; and sustainability and environmental stewardship.

Created2011 to 2017
Description

A report of the Board's activities related to the Statewide Transportation Acceleration Needs Account

Created2001 to 2006
Description

This document is intended to give an overview of the Federal-Aid Program and its impacts on Arizona. There are four major sections in the report: (1) Overview of the Federal-Aid Program; (2) Arizona Federal funding highlights for the fiscal year; (3) Federal-aid Highway Program Characteristics; and (4) Federal-Aid Highway Program

This document is intended to give an overview of the Federal-Aid Program and its impacts on Arizona. There are four major sections in the report: (1) Overview of the Federal-Aid Program; (2) Arizona Federal funding highlights for the fiscal year; (3) Federal-aid Highway Program Characteristics; and (4) Federal-Aid Highway Program descriptions. The first section gives a general overview of how the Federal-Aid Program is financed, the authorization process and a discussion of the apportionment, allocation and obligation authority processes. The second section deals with Arizona Federal funding highlights the for fiscal year. The last two sections are devoted to characteristics of the core programs, including eligibility, limitations, apportionment formulas and descriptions of the funding categories.

Created2000 to 2016
Description

The Arizona Department of Transportation was authorized in 1996 to administer a State Infrastructure Bank under a cooperative agreement with the Federal Highway Administration. The Highway Expansion and Extension Loan Program (HELP) was established. The financial statements present only the funds comprising the Fund and are not intended to present

The Arizona Department of Transportation was authorized in 1996 to administer a State Infrastructure Bank under a cooperative agreement with the Federal Highway Administration. The Highway Expansion and Extension Loan Program (HELP) was established. The financial statements present only the funds comprising the Fund and are not intended to present fairly the financial position or results of operations of the Department.

Created1998 to 2017
Description

The HELP program is meant to be a funding tool to accelerate needed highway projects throughout the state. Board Funding Obligations are an important part of the HELP capitalization and the current stress on the State's General Fund has impacted our ability to use BFOs as a funding source for

The HELP program is meant to be a funding tool to accelerate needed highway projects throughout the state. Board Funding Obligations are an important part of the HELP capitalization and the current stress on the State's General Fund has impacted our ability to use BFOs as a funding source for new loans. Though $140 million of BFOs are authorized by statute to capitalize the HELP, the State Treasurer was required to call all outstanding BFOs in April 2009. Consequently, the State Transportation Board and the Department have suspended the HELP program given the uncertainty of a long term funding source.