The State and Local Arizona Documents (SALAD) collection contains documents published by the State of Arizona, its Counties, incorporated Cities or Towns, or affiliated Councils of Government; documents produced under the auspices of a state or local agency, board, commission or department, including reports made to these units; and Salt River Project, a licensed municipality. ASU is a primary collector of state publications and makes a concerted effort to acquire and catalog most materials published by state and local governmental agencies.

The ASU Digital Repository provides access to digital SALAD publications, however the ASU Libraries’ non-digitized Arizona documents can be searched through the ASU Libraries Catalog. For additional assistance, Ask A Government Documents Librarian.

Publications issued by the Morrison Institute for Public Programs at Arizona State University are also available in PRISM, in the Morrison Institute for Public Policy - Publications Archive collection.

Displaying 1 - 10 of 372
Filtering by

Clear all filters

42400-Thumbnail Image.png
ContributorsArizona. Governor's Drought Task Force (Contributor)
Created2007-12-06
Description

This study is intended to assess flood risk, and identify flood hazards based on those risks, for the Beaver Dam area from the Beaver Dam Wash. The hydrologic and hydraulic results are intended for risk assessment and emergency management purposes only. The results of this study should not be considered

This study is intended to assess flood risk, and identify flood hazards based on those risks, for the Beaver Dam area from the Beaver Dam Wash. The hydrologic and hydraulic results are intended for risk assessment and emergency management purposes only. The results of this study should not be considered as “best available technical information” for floodplain management purposes.”

42401-Thumbnail Image.png
Created2009-01-11
Description

The purpose of the Flood Response Plan is to reduce the potential for property damage and loss of life resulting from floods on the Beaver Dam Wash at the community of Beaver Dam. This report is intentionally short and concise to make it easily usable during a flood emergency.

Created2006 to 2008
Description

The Project is responsible for the design and construction of a 19.6 mile, double track system. These reports offer a month-by-month progress report.

ContributorsValley Metro Rail (Author)
Created2009 to 2016
Description

METRO's management is responsible for establishing and maintaining an internal control structure designed to ensure that the assets of METRO are protected from loss, theft, or misuse and to ensure that adequate accounting data are compiled to allow for the preparation of financial statements.

42452-Thumbnail Image.png
Created2008
Description

Recognizing that public art is an integral element to the success of the system, METRO was proud to incorporate artists in the design process from the very start. The public art that resulted from this process is a celebration of place and community. Each station boasts its own unique character

Recognizing that public art is an integral element to the success of the system, METRO was proud to incorporate artists in the design process from the very start. The public art that resulted from this process is a celebration of place and community. Each station boasts its own unique character with artwork that strives to add substance, style and even a touch of whimsy to the transit experience.

41873-Thumbnail Image.png
ContributorsTucson (Ariz.) (Author)
Created2009-01
Description

A plan to create a foundation upon which solar deployment in southern Arizona can be accelerated.

Created2009 to 2015
Description

This bond funded program differs significantly from other County capital improvement projects which typically include detailed information specific to each project when the bond proposals were developed. It utilizes its designated bond funding for specific community based projects via an open and continuous application process and under the oversight of

This bond funded program differs significantly from other County capital improvement projects which typically include detailed information specific to each project when the bond proposals were developed. It utilizes its designated bond funding for specific community based projects via an open and continuous application process and under the oversight of advisory bodies appointed by the Pima County Board of Supervisors.

Created2011 to 2017
Description

Pima County Department of Environmental Quality monitors ambient (outdoor) air pollutants throughout eastern Pima County, including the Tucson metropolitan area and Green Valley. There are six principal pollutants, called “criteria” pollutants that are monitored in accordance with the National Ambient Air Quality Standards set by the Environmental Protection Agency to

Pima County Department of Environmental Quality monitors ambient (outdoor) air pollutants throughout eastern Pima County, including the Tucson metropolitan area and Green Valley. There are six principal pollutants, called “criteria” pollutants that are monitored in accordance with the National Ambient Air Quality Standards set by the Environmental Protection Agency to comply with the Federal Clean Air Act. These standards were established to protect public health and the environment from harmful levels of air pollution.

Created2010 to 2016
Description

The Pima County Department of Environmental Quality has prepared this document to be submitted to the U.S. Environmental Protection Agency, Region IX. The purpose of the Ambient Air Monitoring Network Plan is to determine if the network is achieving the air monitoring objectives specified in 40 CFR Part 58 Appendix

The Pima County Department of Environmental Quality has prepared this document to be submitted to the U.S. Environmental Protection Agency, Region IX. The purpose of the Ambient Air Monitoring Network Plan is to determine if the network is achieving the air monitoring objectives specified in 40 CFR Part 58 Appendix D, which mandate adherence to certain number, type and location requirements of monitoring sites and specific site criteria such as monitoring inlet height. The review should also determine if modifications should be made to the network (e.g. through the termination or relocation of unnecessary stations or addition of new stations). In addition, the review is necessary in order to ensure that the residents of Pima County are provided adequate, representative and useful air quality data, and to provide adequate protection to public health.