The State and Local Arizona Documents (SALAD) collection contains documents published by the State of Arizona, its Counties, incorporated Cities or Towns, or affiliated Councils of Government; documents produced under the auspices of a state or local agency, board, commission or department, including reports made to these units; and Salt River Project, a licensed municipality. ASU is a primary collector of state publications and makes a concerted effort to acquire and catalog most materials published by state and local governmental agencies.

The ASU Digital Repository provides access to digital SALAD publications, however the ASU Libraries’ non-digitized Arizona documents can be searched through the ASU Libraries Catalog. For additional assistance, Ask A Government Documents Librarian.

Publications issued by the Morrison Institute for Public Programs at Arizona State University are also available in PRISM, in the Morrison Institute for Public Policy - Publications Archive collection.

Displaying 1 - 10 of 54
Filtering by

Clear all filters

Created2005-02
Description

In 2001, ADWR undertook a review of the Upper San Pedro Basin to determine if it met the statutory requirements for designation as an AMA. This report reviews the water supply and demand of the USP Basin in the context of the statutory criteria and includes a discussion of whether

In 2001, ADWR undertook a review of the Upper San Pedro Basin to determine if it met the statutory requirements for designation as an AMA. This report reviews the water supply and demand of the USP Basin in the context of the statutory criteria and includes a discussion of whether any of the criteria have been met. Previously, ADWR conducted a study of the USP Basin and issued a report in 1988 in which ADWR determined that the Basin did not meet the statutory criteria for AMA designation. ADWR indicated in the report that it would reassess conditions in the Basin in ten to fifteen years. The study described in this report is an evaluation of whether the conditions of the USP Basin satisfy the statutory criteria. This report contains a description of the current and projected water resources and water demand in the Basin, incorporating new information since the previous review. The report examines historic water use trends, evaluates the groundwater resources of the Basin, and projects impacts of future water use on Basin groundwater supplies. The report includes an evaluation of the incidence of subsidence or fissuring, and of the potential for groundwater quality degradation due to groundwater use. The report further describes and evaluates the impact that AMA practices would have on water use, and includes a summary of findings, the director’s determination of whether the Basin should be designated and recommendations.

Created2012-05
Description

In 2011, Drachman Institute contracted with the Arizona Department of Housing to develop a public education project about sustainable communities and transit-oriented development along the Metro Light Rail in Phoenix, Tempe, and Mesa, Arizona. The resulting reports present neighborhood analyses and transit-oriented development issues for eight light rail stations selected

In 2011, Drachman Institute contracted with the Arizona Department of Housing to develop a public education project about sustainable communities and transit-oriented development along the Metro Light Rail in Phoenix, Tempe, and Mesa, Arizona. The resulting reports present neighborhood analyses and transit-oriented development issues for eight light rail stations selected by the Arizona Department of Housing and the Sustainable Communities Working Group, providing base information on the square half mile area surrounding these sites.

Created2006 to 2008
Description

The Project is responsible for the design and construction of a 19.6 mile, double track system. These reports offer a month-by-month progress report.

ContributorsValley Metro Rail (Author)
Created2009 to 2016
Description

METRO's management is responsible for establishing and maintaining an internal control structure designed to ensure that the assets of METRO are protected from loss, theft, or misuse and to ensure that adequate accounting data are compiled to allow for the preparation of financial statements.

Created2007 to 2017
Description

The 20-year transportation plan includes roadway, transit, safety, and environmental and economic vitality elements to help meet the region's transportation goals of improving our safety and cross-town mobility, while reducing traffic congestion.

Created2011-09
Description

The purpose of this project is to provide regional managers and the public with updated comprehensive maps and accompanying datasets for GRD members within the TAMA in the context of its impact patterns on AWS. These datasets are available in raw format from PAG and also will be provided on

The purpose of this project is to provide regional managers and the public with updated comprehensive maps and accompanying datasets for GRD members within the TAMA in the context of its impact patterns on AWS. These datasets are available in raw format from PAG and also will be provided on the Pima County Map Guide Web site for interactive viewing. In the past, CAP also has used this report to address boundary reconciliation issues.

Created2002 to 2016
Description

Information about the quality of the drinking water that Tucson Water provides.

Created2002 to 2013
Description

A report of the activities and finances of Tucson Water, an enterprise fund of the City of Tucson, managed by the city Water Department.

Created2008 to 2009
Description

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen into disrepair or had been sold off. Eventually, the City of Tucson acquired a large portion of the old fort which became what is today’s “Fort Lowell Park.” A 5.2 acre (“Adkins”) parcel of the former fort containing several original adobe buildings was still in private ownership, and the 2004 County bond election passed a proposal to acquire the land and preserve the historic resources.

Created2009 to 2010
Description

As a result of high growth rates, physically and legally limited water supplies, drought, economic constraints, and relatively little comprehensive water resource planning and management, water supplies are stressed in some parts of Arizona. The Arizona Department of Water Resources has collected and synthesized currently available water-related information for the

As a result of high growth rates, physically and legally limited water supplies, drought, economic constraints, and relatively little comprehensive water resource planning and management, water supplies are stressed in some parts of Arizona. The Arizona Department of Water Resources has collected and synthesized currently available water-related information for the State of Arizona into a “water atlas,” organized by planning area.