The State and Local Arizona Documents (SALAD) collection contains documents published by the State of Arizona, its Counties, incorporated Cities or Towns, or affiliated Councils of Government; documents produced under the auspices of a state or local agency, board, commission or department, including reports made to these units; and Salt River Project, a licensed municipality. ASU is a primary collector of state publications and makes a concerted effort to acquire and catalog most materials published by state and local governmental agencies.

The ASU Digital Repository provides access to digital SALAD publications, however the ASU Libraries’ non-digitized Arizona documents can be searched through the ASU Libraries Catalog. For additional assistance, Ask A Government Documents Librarian.

Publications issued by the Morrison Institute for Public Programs at Arizona State University are also available in PRISM, in the Morrison Institute for Public Policy - Publications Archive collection.

Displaying 1 - 10 of 215
Filtering by

Clear all filters

Created2012-11
Description

The continued growth of the human-built environment in Pima County, Arizona will result in the “incidental take” of species that are listed under the Endangered Species Act. To avoid, minimize, and mitigate impacts to both listed and unlisted species and their habitats, Pima County is submitting this Multi-species Conservation Plan

The continued growth of the human-built environment in Pima County, Arizona will result in the “incidental take” of species that are listed under the Endangered Species Act. To avoid, minimize, and mitigate impacts to both listed and unlisted species and their habitats, Pima County is submitting this Multi-species Conservation Plan for 44 species that may be impacted as a result of the otherwise lawful activities of Pima County and its development community. The Incidental Take Permit, also called a Section 10 permit, will be for 30 years. This MSCP is part of the required documentation needed to receive an Incidental Take Permit under Section 10(a)(1)(B) of the ESA.

Created2005-02-03
Description

The Multiple Species Conservation Plan will complete the land use planning process in a conflict between competing interests on the question of growth. A path of balance was chosen by advancing the Sonoran Desert Conservation Plan. This second draft will be posted on the website and distributed to interested community

The Multiple Species Conservation Plan will complete the land use planning process in a conflict between competing interests on the question of growth. A path of balance was chosen by advancing the Sonoran Desert Conservation Plan. This second draft will be posted on the website and distributed to interested community and committee members. A public process will be conducted so that during 200t the document can be finalized and submitted to the U.S. Fish and Wildlife Service as part of the application for a federal endangered species permit.

Created1998 to 1999
Description

This report is intended to provide useful information about the condition of the State Highway System in a format that is readily accessible to transportation professionals and non-professionals. This report was produced by the Planning Team of the Transportation Planning Division.

Created2008 to 2009
Description

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen into disrepair or had been sold off. Eventually, the City of Tucson acquired a large portion of the old fort which became what is today’s “Fort Lowell Park.” A 5.2 acre (“Adkins”) parcel of the former fort containing several original adobe buildings was still in private ownership, and the 2004 County bond election passed a proposal to acquire the land and preserve the historic resources.

Created1990 to 2009
Description

The five-year construction program is a budget of what Arizona expects to receive in funds from various sources and how it proposes to spend them project by project. The highways and airport programs will result in a better quality of life for all citizens.

Created2006 to 2017
Description

The purpose of the Program is to set forth the plan for developing projects and account for the spending funds for the next five years. All projects in the first two years of the program will be fully funded and ready to advertise within the year programmed or sooner as

The purpose of the Program is to set forth the plan for developing projects and account for the spending funds for the next five years. All projects in the first two years of the program will be fully funded and ready to advertise within the year programmed or sooner as determined by the State Transportation Board. The last three years of the program will be illustrative in nature and be used to establish an implementation plan for projects moving through the various preparation phases needed prior to the construction of the project.

ContributorsArizona State Parks Board (Author)
Created2006 to 2016
Description

Arizona State Parks' mission is to preserve Arizona’s most precious resources while producing revenues for the State from more than two million annual guests. Visitors from all over the world enjoy Arizona State Parks’ 30 natural and cultural sites.

Created2009 to 2017
Description

Constitutes the Department's annual report and projected plans for the coming year. The report covers a five year period, but is issued annually.

Created2011-07
Description

One in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to assess the ultimate corridor footprint requirements to enable consistent implementation across multiple jurisdictions. The study area for this project includes Peoria Avenue from the future Jackrabbit Trail Parkway alignment to Dysart

One in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to assess the ultimate corridor footprint requirements to enable consistent implementation across multiple jurisdictions. The study area for this project includes Peoria Avenue from the future Jackrabbit Trail Parkway alignment to Dysart Road (Peoria Avenue Corridor). The study area generally encompasses a two-mile wide corridor centered on the existing Peoria Avenue.