The State and Local Arizona Documents (SALAD) collection contains documents published by the State of Arizona, its Counties, incorporated Cities or Towns, or affiliated Councils of Government; documents produced under the auspices of a state or local agency, board, commission or department, including reports made to these units; and Salt River Project, a licensed municipality. ASU is a primary collector of state publications and makes a concerted effort to acquire and catalog most materials published by state and local governmental agencies.

The ASU Digital Repository provides access to digital SALAD publications, however the ASU Libraries’ non-digitized Arizona documents can be searched through the ASU Libraries Catalog. For additional assistance, Ask A Government Documents Librarian.

Publications issued by the Morrison Institute for Public Programs at Arizona State University are also available in PRISM, in the Morrison Institute for Public Policy - Publications Archive collection.

Displaying 1 - 1 of 1
Filtering by

Clear all filters

121044-Thumbnail Image.png
Created2009-09
Description

The deck of the Sunshine Bridge overpass, located westbound on Interstate 40 (I-40) near Winslow, Arizona, was replaced on August 24, 2005. The original deteriorated concrete deck was replaced using high performance concrete (HPC), reinforced with low-carbon, low-corrosion reinforcing steel. HPC is a new technology in Arizona. This report documents

The deck of the Sunshine Bridge overpass, located westbound on Interstate 40 (I-40) near Winslow, Arizona, was replaced on August 24, 2005. The original deteriorated concrete deck was replaced using high performance concrete (HPC), reinforced with low-carbon, low-corrosion reinforcing steel. HPC is a new technology in Arizona. This report documents the first survey of the deck's condition and recommends that ADOT embark on a monitoring program to evaluate the performance of HPC. The ADOT monitoring program should consist of visual observation of the deck condition and concrete sampling and testing to measure and document HPC performance. The survey presented in this report was performed on December 18, 2007, which represents the first field survey since concrete deck placement. Visual observation and test results show the following: 1. The concrete has a very low chloride permeability. 2. The concrete has significantly slowed down and/or prevented chloride penetration through the bridge deck. 3. The average air-void parameters of HPC do not meet the industry standards for frost resistant concrete. 4. The deck surface appears to have minimal wear from snow removal equipment and shows no signs of concrete cracking. HPC appears to perform very well during the monitoring period despite the lower than recommended air void system. There were no signs of deterioration or adverse field conditions. It is recommended that bridge deck monitoring and concrete testing be done annually or biennially throughout the bridge's estimated 50-year service life to confirm long-term performance of HPC. It is also recommend that the next monitoring survey be initiated and conducted before the end of the year 2009.